The sugar mill having co- generation of the capacity of 15 MW. Bagasse based co generation plant using hi pressure boiler .After in house consumption surplus electricity is exported in state electricity Grid through a nearby 220Kv substation, through dedicated transmission line of 7.1 kilometer. Recently we are commissioned 24 TPH incenration Boiler.
# | Make | Capacity | Installation Year | Working Pressure | Working Temp. | Fuel | Type of Boiler |
---|---|---|---|---|---|---|---|
1 | ISGEC | 85TPH | 2016 | 87 Kg/Cm2 | 510 0C + 5 | Bagasse | Traveling Grate |
2 | WIL | 30TPH | 1985 | 21 Kg/Cm2 | 380 0C + 5 | Bagasse | Dumping Grate |
3 | WIL | 30TPH | 1985 | 21 Kg/Cm2 | 380 0C + 5 | Bagasse | Bubbling Bed |
4 | Thermax | 24TPH | 2023 | 45 Kg/Cm2 | 400 0C + 5 | Multi Fuel | AFBC incenration |
# | Make | Capacity | Installation Year | Working Pressure | Working Temp. | Type of Turbine |
---|---|---|---|---|---|---|
1 | Siemens | 15 MW | 2016 | 86 Kg/Cm2 | 510 0C + 5 | Back Pressure |
2 | APE Belliss | 1.5 MW | 1985 | 21 Kg/Cm2 | 380 0C + 5 | Back Pressure |
3 | Siemens | 2.2 MW | 2023 | 44 Kg/Cm2 | 400 0C + 5 | Back Pressure |
Bagasse Based | Season | off Season |
---|---|---|
Generation | 18.7 MW | 2.2 MW |
In House Consumption | 13.0 MW | 2.2 MW |
Exportable | 5.7 MW | --- |
De-Mineralization –RO/UF -2 Nos
All plant operation are monitored and controlled by a modern Distribution controlling System (DCS).Make Siemens and Honey well.